Axemans Cottage / Cavity Membranes

The cellar had been constructed and waterproofed 2-3 years before LSE and Cellar-Tech were called in by the building contractor because there were problems with water ingress.


LSE Cellar-Tech specified the Delta membrane system with an upgraded sump and pump with battery back up and alarms .
Peripheral drainage was installed which drained to the new sump with double pumps.

The floor was covered with a sealed MS20 system and the bottom half of the walls were covered with a Delta PT Membrane.
The work was carried out in approximately two weeks and guaranteed for a period of ten years by LSE Building Preservation.

 

     

     

     

     

     


      